Dredger returns to clear the inner harbour

The inner basin has lost nearly a metre of depth since the last clearance in 2022, and the smaller boats have been catching the mud at low water. The dredger will work the eastern side first, around the fish quay, and move west under the bridge in the second week.

Berth holders are asked to move anything moored against the north wall by Sunday evening. Spoil goes to the marsh restoration at the point, as it did last time.

A demonstration: Saltmarsh and its Ledger are invented. Built by plinth from EDN and Markdown; the front's further pages are real pages and are also pulled in place where scripts run, and a click from the front to a story and back swaps the page in place, every address still a real page.